  • Spall repair at the Maui Sands which is 50 feet from the ocean.

     

    Spall repair at the Maui Sands which is 50 feet from the ocean.
  • Concrete removed and rebar treated with a rust inhibitor

     

    Concrete removed and rebar treated with a rust inhibitor
  • Formwork is in place outside the railings

     

    Formwork is in place outside the railings
  • Formwork removal.

     

    Formwork removal.
  • After the concrete pour and before the finish work

     

    After the concrete pour and before the finish work
  • Spall on the ceiling of the walkway

     

    Spall on the ceiling of the walkway
  • This spalling is due to rebar and electric conduit corrosion.

     

    This spalling is due to rebar and electric conduit corrosion.
  • Staircase has spalling due to rebar corrosion.

     

    Staircase has spalling due to rebar corrosion.
  • Rebar is treated with rust inhibitor.

     

    Rebar is treated with rust inhibitor.
  • Treating rebar helps prevent the corrosion which spalled the concrete.

     

    Treating rebar helps prevent the corrosion which spalled the concrete.
  • Formwork in place. Ready for the concrete pour.

     

    Formwork in place.  Ready for the concrete pour.
  • Concrete and structure are repaired. All that's left is painting.

     

    Concrete and structure are repaired.  All that's left is painting.
  • Overhead cracks are being fixed by injection.

     

    Overhead cracks are being fixed by injection.